Harbin Metro

From Infogalactic: the planetary knowledge core
(Redirected from Harbin Subway)
Jump to: navigation, search
Harbin Metro
Harbin Metro logo.svg
Overview
Owner Harbin Municipal People's Government
Locale Harbin
Transit type rapid transit
Number of lines 1
Number of stations 18
Website www.harbin-metro.com
Operation
Began operation 26 September 2013
Technical
System length 17.47 km (11 mi)
Track gauge 1435 mm
System map

Harbin Metro System Map.svg

Harbin Metro
Simplified Chinese 哈尔滨地铁
Traditional Chinese 哈爾濱地鐵

Harbin Metro is the metro system of Harbin, the provincial capital of Heilongjiang Province in northeastern China. The system began operation on 26 September 2013 with the opening of Line 1, which is 17.47 km (11 mi) in length and has 17 stations in service. The system is undergoing expansion and is expected to have a total of three lines and 89.58 km (56 mi) of track in service by 2018.[1]

Hours and fares

In the winter time, the metro begins operation at 6:00 am and the last train departs at 9:00 pm.[2] Fares range from Y2 to Y4 depending on trip distance.[2] Single-ride and rechargeable fare cards may be purchased at ticket windows or automatic fare card machines in each station.[2]

Line in operation

Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
Lua error in package.lua at line 80: module 'strict' not found. Hadongzhan
(Daowai)
Hananzhan
(Nangang)
2013 17.47 18
Total 17.47 18

Line 1

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The Line 1 is oriented along the east–west axis of the urban area of Harbin: from north-east (Harbin East Railway Station) to south-west (2nd Affiliated Hospital of Harbin Medical University). The Museum Station on Line 1 was not in operation as of 26 September 2013.[3]

History

The Harbin Metro was approved by the State Council in 2005. The initial investment was estimated to cost USD 643 million. The project was headed by the Harbin Municipal People's Government Metro Construction, which established a Track Traffic Construction Office led by the city's construction commission. In 2006, an official "Initiation Ceremony of Harbin Metro Trial Project" was held, signifying the actual implementation of Harbin Line 1 project.[4][5] The builders made use of a 10.1 km air defense tunnel built in the 1970s as part of the “7381” civil air-defense, which forms part of Line 1.[3]

Construction on Line 1 began a second time on 29 September 2009[3] and was later halted and began a third time in March 2010.[6] In March 2011 the contract for traincars for first line was signed with Changchun Railway Vehicles co. ltd. Target date for opening of first line of 17.47 km length with 18 stations was set to the end of 2012.[7] The line actually opened on 26 September 2013.[1]

Future lines

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

After Line 1 (Red), more two lines will be open: Line 2 (Violet) from east to northwest with 17 stations and Circle Line 3 (Orange) with 32 stations. By 2020, as many as five lines with total length of 143 km could be completed.

Years Lines Section Satus Length Stations Terminus
2017 Lua error in package.lua at line 80: module 'strict' not found. Phase 1 No Train is Testing 4.8km 5 Yidaeryuan-Chengxianglu
2019 Lua error in package.lua at line 80: module 'strict' not found. Phase 3 Under Consturation 8.54km 5 Hananzhan-Xinjiangdajie
2020 Lua error in package.lua at line 80: module 'strict' not found. Phase 1 28.7km 19 Songbei University Town-Qixiangtai
Lua error in package.lua at line 80: module 'strict' not found. Phase 2 Southeast 2.9+15.2km 4+14 Chengxianglu-Sport Park/Yidaeryuan-Taipinqiao
2022 Lua error in package.lua at line 80: module 'strict' not found. Phase 2 Northwest 13.7km 11 Taipinqiao-Sport Park
After 2025 Lua error in package.lua at line 80: module 'strict' not found. Phase 4 Under Planning 2.6km 2 Hadongzhan-Dongbeihuagongchang
Lua error in package.lua at line 80: module 'strict' not found. Phase 2 9.8+4.3km 8+3 Songbei University Town-Dalianlu/Qixiangtai-Xinfuzhen
Lua error in package.lua at line 80: module 'strict' not found. Phase 1 32.2km 27 Qiansha-Keyanjie
Lua error in package.lua at line 80: module 'strict' not found. Phase 1 36.1km 25 Dongsanhuan-Nanjinglu

References

  1. 1.0 1.1 "Metro line operational in China's Harbin" 2013-09-26
  2. 2.0 2.1 2.2 (Chinese) 哈尔滨地铁26日开通 10时30分开始售票三种方式购票 2013-09-26
  3. 3.0 3.1 3.2 (Chinese) 哈尔滨地铁1号线载客试运营正式开通 2013-09-26
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. A video showing the construction of the metro can be found here
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.

External links