Interstate 73 in North Carolina

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Interstate 73 marker

Interstate 73
290x172px
Open segments of I-73 as of May 2015 in red
Route information
Maintained by NCDOT
Length: 76.5 mi[1][2][3] (123.1 km)
Existed: 1997 – present
Major junctions
South end: US 220 near Ellerbe
  US 64 / NC 49 in Asheboro
I‑85 / US 220 / US 421 in Greensboro
I‑40 / I‑840 / US 421 in Greensboro
North end: I‑840 / Bryan Boulevard in Greensboro
Location
Counties: Richmond, Montgomery, Randolph, Guilford
Highway system
NC 72 NC 73

Interstate 73 (I-73) is a partially completed Interstate Highway in the U.S. state of North Carolina, traversing the state from south of Ellerbe to Greensboro, through Asheboro. When completed, it will continue south towards Myrtle Beach, South Carolina and north to Martinsville, Virginia.

Route description

Lua error in package.lua at line 80: module 'strict' not found. As of May 2015, Interstate 73 begins south of Ellerbe, in concurrency with I-74 and US 220, to north of Asheboro. I-73 and I-74 travel north through northern Richmond County and into eastern Montgomery County. In Montgomery County, the Interstates pass between the county's eastern border and the Uwharrie National Forest. The freeway enters Randolph County and passes just west of Asheboro. In Randleman, I-74 splits northwest towards High Point and Winston-Salem. North of the I-74 split, I-73 passes over Randleman Lake, a reservoir formed by the blocking of the Deep River and passes into Guilford County. Entering Greensboro, it ends its concurrency with US 220 as it goes northwest along the Greensboro Urban Loop with US 421 and brief parallel with I-85. At its connection with I-40, US 421 continues north (or geographically west) to Winston-Salem, while I-840 begins. At the Bryan Boulevard exit, both I-73 and I-840 currently end.[4][5][6]

History

File:Future73nbfuture74wb.JPG
Future I-73 and I-74 (US 220) northbound near Asheboro, NC, signs were removed when freeway designated I-73/I-74 in 2012

Authorized by the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), Interstate 73 was established as a north-south high priority corridor from Charleston, South Carolina to Detroit, Michigan.[7][8]

In North Carolina, because of several U.S. Routes were already planned for improvements in the central piedmont area, Interstate 73 was initially aligned to go through Rockingham, Asheboro, High Point, Winston-Salem, and Mount Airy.[9] The route through High Point was approved in May 1993.[10] However, in November 1993, an organization called Job Link, made up of business leaders from northern North Carolina and southern Virginia, wanted a major highway to connect Roanoke with the Greensboro area. It could be Interstate 73, the group said, but did not have to be.[11] In April 1995, John Warner, who chaired the Senate subcommittee which would select the route of Interstate 73, announced his support for the Job Link proposal. This distressed Winston-Salem officials who were counting on Interstate 73, though Greensboro had never publicly sought the road. But an aide to US Senator Lauch Faircloth said the 1991 law authorizing Interstate 73 required the road to go through Winston-Salem. Faircloth got around this requirement, though, by asking Warner to call the highway to Winston-Salem Interstate 74.[12] In May, Warner announced plans to propose legislation that made the plan for two Interstates official.[13]

When I-73 crossed a border between two states, the federal law authorizing the road required that the two states agree that their sections meet. Originally, both Carolinas selected a route running south from Rockingham. However, North Carolina had more money to spend on roads,[14] and on May 10, 1995, the U.S. Senate Environment and Public Works Committee approved North Carolina's plan for I-73 to run eastward to the coast and enter South Carolina at North Myrtle Beach.[15] Later that year, officials in both states agreed that I-73 would enter South Carolina south of Rockingham and that the other highway would be I-74. This raised the possibility of I-73 bypassing the Myrtle Beach area entirely, since I-74 would run to the Myrtle Beach area.[16]

In May 1997, the first section of Interstate 73 was established, a 12.6 miles (20.3 km) section from south of Candor to Ulah. Signage of "Future Interstate 73" was also placed all along US 220, from Rockingham north to I-40 in Greensboro and south to Candor.[17][18] On January 7, 2008, an Lua error in Module:Convert at line 272: attempt to index local 'cat' (a nil value). extension south of Candor to Ellerbe was completed; however, because NCDOT had not applied to the FHWA to add the segment to the interstate system, signage along the new stretch of freeway was listed as Future Interstate 73, thus not an "official" addition to the interstate at that time. Federal approval was granted in 2010 to make this part of the interstate system at the conclusion of work to upgrade the highway in Asheboro. The route was given interstate signage in the summer of 2013.[19]

The next section to be completed, and bannered Interstate 73, was the 7.5 miles (12.1 km) southwestern section of the Greensboro Urban Loop, in concurrency with Interstate 40, in February, 2008.[20] The concurrency later changed to US 421 in September of same year (signage corrected by July, 2009).[21][22][23]

The newest sections of Interstate 73 to be completed are the 8 mile stretch of US 220 freeway in Asheboro and the remaining parts of the US 220 freeway designated Future I-73 in 1997. The Asheboro section had several deficiencies that needed to be corrected before it could be designated an Interstate. Work started on this segment from Business 220/NC 134 south of Asheboro to US 220 Business/Vision Drive North of Asheboro in 2010. Work was completed in October 2012. When work was finished Interstate 73 (and 74) shields replaced the Future I-73(and I-74) shields along this portion of US 220.[4] NCDOT had already reached an agreement with the FHWA that they could sign the entire length of the US 220 freeway south of Greensboro to Ellerbe as Interstate 73 once this project was completed.[24] On July 11, 2012, NCDOT gave final approval an extension of Interstate 73 from Interstate 85 to Asheboro to be designated as part of its network.[25] A contract to change the Future I-73 signs to I-73 shields and replace current exit signage with Interstate standard ones was let on December 11, 2012.[26] On February 2013, work crews began converting a 70-mile (110 km) stretch of signage for Interstate 73; work was completed in December 2013.[27] I-73 is thus signed continuously from I-40 in Greensboro to US 220 in Ellerbe, a total of 78 miles. Highways completed, but not signed currently as I-73 include the section of the Greensboro Loop north of I-40, a total of 4 miles, and the US 74 Rockingham Bypass, a total of about 10 miles. Therefore, North Carolina has completed a total of 92 miles of current or future I-73 mileage.[28]

Future

Interstate 73 from the South Carolina state line to US 74/NC 38 interchange is being planned and paid for by SCDOT. Environmental studies were completed in 2011, with a route that includes an interchange at Ghio Road and welcome centers at the state line. Time frame when construction will begin is unknown at this time.[29][30][31][32]

The Western Rockingham Bypass, from the US 74/US 74 Bus interchange to US 220, near Ellerbe. Currently all right-of-way purchases have been completed along the proposed route. Construction on a 3.724-mile (5.993 km) section, along US 220 (south of Ellerbe), began in March 2014; with a contracted amount of $49.8 million, it is expected to be completed by April 2018. The remaining sections of the new bypass were scheduled to start construction by late 2017; however, under reprioritization of construction projects announced in 2014, they were removed from the list of projects to be started through 2024.[33]

A new segment of the I-73 freeway from NC 68, near PTI Airport, to NC 68 at US 220 near the Haw River, is planned in Guilford and Rockingham Counties. All right-of-way purchases have been completed along the proposed route, with construction beginning in April 2014 and scheduled to be completed by April 2017.[34]

Exit list

County Location mi[2] km Old exit New exit Destinations Notes
Richmond State line I-73 south – Myrtle Beach Future continuation into South Carolina
Ghio Road Future interchanges (unfunded)[31][32]

Future I‑74 east / US 74 east – Laurinburg
NC 38 – Bennettsville Existing interchanges of US 74 (built to interstate standards, signed future due to no connection to interstate)
NC 177 – Hamlet
Rockingham US 1 to US 220 – Rockingham, Southern Pines, Cheraw
Galestown Road – Cordova

US 74 west / US 74 Bus. east – Wadesboro, Rockingham
Future interchange (unfunded)[33]
22 US 220 south – Rockingham Future interchanges (under construction, to be completed by March 2018)[33]
23 Dockery Road / Haywood Cemetery Road
24.9 40.1 8 25 US 220 north – Ellerbe Current southern terminus of I-73
Ellerbe 27.5 44.3 11 28 To NC 73 west / Millstone Road
29.9 48.1 13 30 Haywood Parker Road
33.1 53.3 16 33 NC 73 – Windblow, Plainview
Norman 35.0 56.3 18 35 Moore Street – Norman
Montgomery 39.0 62.8 22 39 Tabernacle Church Road
Emery 40.9 65.8 24 41
US 220 south / US 220 Alt. north – Candor
South end of US 220 overlap
Candor 44.0 70.8 44 NC 211 – Candor, Pinehurst
Biscoe 49.0 78.9 49 NC 24 / NC 27 – Biscoe, Carthage, Troy
Star 52.2 84.0 52 Spies Road – Star, Robbins
Ether 55.3 89.0 39 56
US 220 Alt. – Ether, Steeds
Randolph 58.0 93.3 41 58 Black Ankle Road
Seagrove 61.3 98.7 45 61 NC 705 – Seagrove, Robbins
65.4 105.3 49 65 New Hope Church Road To North Carolina Zoo
67.6 108.8 51 68
US 220 Bus. north / NC 134 south – Ulah, Troy
To US 220 Alt

US 64 Byp.
Future interchange (under construction, to be completed by September 2019)[35]
Asheboro 71.3 114.7 71 McDowell Road
72.4 116.5 72
A-B
A: US 64 east / NC 49 north – Raleigh
B: US 64 west / NC 49 south – Lexington, Charlotte
To North Carolina Zoo
74.0 119.1 74 NC 42 – Asheboro Exit left
74.8 120.4 75 Presnell Street
75.7 121.8 76
To US 220 Bus. north / North Fayetteville Street / Vision Drive
77.1 124.1 77 Spero Road
78.5 126.3 79 Pineview Street
Randleman 79.5 127.9 80 I‑74 west – High Point, Winston-Salem West end of I-74 overlap
80.5 129.6 81 US 311 north – Randleman
82.2 132.3 82 Academy Street  – Randleman
Level Cross 86.3 138.9 86
US 220 Bus. south – Level Cross
Guilford 89.0 143.2 89 NC 62 – Climax, High Point
93.6 150.6 77 94 Old Randleman Road
Greensboro 95.0 152.9 78
A-B
95
A-B
A: I‑85 north / US 421 south – Durham, Sanford
B: US 220 north to I‑85 Bus. to US 29 to US 70 – Charlotte, Burlington
North end of US 220 and south end of US 421 overlap
Continuation of I-73 northbound exit 95B and southbound exit 95
96.9 155.9 122A 96 To Groometown Road / To Grandover Parkway Northbound exit and southbound entrance only
97.0 156.1 219
218
97
A-B
A: I‑85 Bus. north / US 29 north / US 70 east – Greensboro
B: I‑85 south / I‑85 Bus. south / US 29 south / US 70 south – High Point, Charlotte
Both southbound exits and northbound entrances
102.5 165.0 213 102 Wendover Avenue
103.6 166.7 1
A-B
103
A-B
A: I‑40 east – Greensboro
B: I‑40 west / US 421 north – Winston-Salem
West end of I-840 and north end of US 421 overlap; northbound exit left
105.3 169.5 2 104 West Friendly Avenue
107.3 172.7 3 107 Bryan Boulevard – PTI Airport East end of I-840 overlap; northbound exit, southbound entrance[36]
Current northern terminus of I-73
109 Old Oak Ridge Road  – PTI Airport Existing interchange of Bryan Boulevard (pending FHWA approval)[36][37]
NC 68 south – High Point, Winston-Salem Future interchanges (under construction, to be completed by April 2017)[38][39][40]
NC 68 – Oak Ridge
Summerfield NC 150 – Summerfield, Oak Ridge
US 220 south – Summerfield, Greensboro Future interchanges (under construction, to be completed by December, 2016)[34]
Stokesdale US 158 – Stokesdale, Reidsville
Rockingham NC 65 – Stokesdale, Reidsville
NC 68 south – Stokesdale
Madison
US 311 south / US 220 Bus. north / NC 704 – Madison, Wentworth
Existing interchanges of US 220 (upgrade to interstate standards, unfunded)[41]
Mayodan US 311 north / NC 135 – Mayodan, Eden

US 220 Bus. south – Stoneville
Stoneville NC 770 – Stoneville, Eden
State line I‑73 / US 220 north – Martinsville Future continuation into Virginia
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.[unreliable source?]
  18. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  19. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  20. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. NCDOT. TIP No. I-5329 (Contract DH00095) Upgrade signs to interstate standards along I-73/74 from I-85 in Guilford County to south of Ellerbe in Richmond County. Project Letting, Division 8, December 11, 2012. Downloaded from: https://connect.ncdot.gov/letting/Pages/Letting-Details.aspx?let_type=8&let_date=2012-12-11%2000:00:00
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  29. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. 31.0 31.1 Lua error in package.lua at line 80: module 'strict' not found.
  32. 32.0 32.1 Lua error in package.lua at line 80: module 'strict' not found.
  33. 33.0 33.1 33.2 Lua error in package.lua at line 80: module 'strict' not found.
  34. 34.0 34.1 Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. 36.0 36.1 Lua error in package.lua at line 80: module 'strict' not found.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".

  • Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons
Interstate 73
Previous state:
South Carolina
North Carolina Next state:
Virginia

es:Interestatal 73