Mapeera House

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Mapeera House
General information
Type Commercial
Location Kampala Road
Kampala, Uganda
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction started October 2007
Completed Opened 10 June 2012
Technical details
Floor count 19
Design and construction
Architect Ssentoogo & Partners

Mapeera House is a building in Kampala, the capital and largest city of Uganda.

Location

The skyscraper is located on Kampala Road, the main business street in Kampala's central business district.[1]

Overview

Mapeera House is named after Father Siméon Lourdel (1853–1890), also referred to in French as Mon Pere. The Baganda changed that to Mapeera. He was the first Catholic Priest to set foot in Uganda in 1879.[2] Mapeera House serves as the headquarters of Centenary Bank, the fourth-largest bank in Uganda, and the second-largest indigenous commercial bank in the country, by assets.[3] The bank also maintains its main branch at this location. The building consists of 17,000 square metres (180,000 sq ft) of office space, most of it available for rent to qualified tenants, raising income for the bank. The nineteen-storey building also has 16,000 square metres (170,000 sq ft) of underground parking space, enough to accommodate up to about 100 vehicles.[4][5]

History

The idea to construct Mapeera House was the brainchild of the Late Cardinal Emmanuel Kiwanuka Nsubuga (1914–1991), the second Ugandan to be consecrated Cardinal of the Catholic Church.[6] He died before his dream was realised. In October 2007, after ten years of planning, a ground-breaking ceremony was held at the present location, presided over by Cardinal Emmanuel Wamala.[7] Roko Construction Limited, a Ugandan construction company was contracted to construct the building at an estimated cost of approximately US$30 million (USh75 billion). The building was commissioned on 10 June 2012, by Yoweri Museveni, the president of Uganda. At completion, the construction costs had increased to US$40 million (UGX:100 billion).[8][9]

See also

<templatestyles src="Div col/styles.css"/>

3

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Asset Allocation Among Commercial Banks In Uganda
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.

External links